Diagnostic tools

See where your plant is really losing time.

10 free calculators, each built around one question from the shop floor. Enter your own numbers and get a clear result, with the scoring explained.

Diagnostic Tools

One shop-floor question per tool.

01Plant health

Operational Reliability Check

Your output number is one tile. Add seven more signals from the same month and see whether the plant hit its target calmly or through heroics.

Open
02Shift losses

480-Minute Diagnostic Lite

Five loss buckets, one answer: how many of today's 480 minutes actually made product, and where the biggest hidden loss sits.

Open
03Scheduling

Six-Gate Readiness Check

List tomorrow's jobs and tap each gate: pass, fail or unknown. A job is executable only when all six gates pass. Anything else is at risk, however good the schedule looks.

Open
04Waiting

Waiting Audit

Watch one line for two hours and log every wait. The audit sorts them into six kinds of waiting and shows which one dominates, and whose move it was.

Open
05Downtime

Loss Classification Wizard

Answer up to seven yes/no questions about one stop. The wizard names the kind of loss, who owns it and what usually fixes it. Then re-sort a whole day's “downtime”.

Open
06Readiness

Production Readiness Score

Answer 12 questions about tomorrow's first jobs. You'll see, condition by condition, whether your plan is Ready, At risk or Not ready, and who should act tonight.

Open
07Shift losses

480-Minute Shift Loss Mapper

Split one 8-hour shift into loss buckets. Run time is whatever is left. The mapper shows how much of the loss your reports can't see, and your largest recoverable bucket.

Open
08Dispatch

End-to-End Reliability Checklist

Follow one typical order past the last machine. Enter how long it waits at each step, then check seven controls. You'll see where OEE stops seeing your system.

Open
09Planning

Plan Stability Assessment

Count last week's plan changes and check how they were handled. You'll get a Plan Stability Index out of 100 and the two fixes that would move it most.

Open
10Material

Material Readiness Checker

The ERP says you have it. Check one job's material against eight layers of readiness, see where it drops out, and keep a tally across jobs.

Open