Free diagnostic tool · Plant health
Operational Reliability Check
Your output number is one tile. Add seven more signals from the same month and see whether the plant hit its target calmly or through heroics.
Companion to the article “A Factory Can Hit Its Production Number and Still Be Operationally Unhealthy”. Results are based on your own estimates and give direction, not a benchmark. Your entries are calculated in your browser and aren't submitted to us.
Two more from the shop floor.
480-Minute Diagnostic Lite
Five loss buckets, one answer: how many of today's 480 minutes actually made product, and where the biggest hidden loss sits.
Six-Gate Readiness Check
List tomorrow's jobs and tap each gate: pass, fail or unknown. A job is executable only when all six gates pass. Anything else is at risk, however good the schedule looks.