Free diagnostic tool · Shift losses
480-Minute Shift Loss Mapper
Split one 8-hour shift into loss buckets. Run time is whatever is left. The mapper shows how much of the loss your reports can't see, and your largest recoverable bucket.
Companion to the article “Where Did the 480-Minute Shift Actually Go?”
- Instant result
- No sign-up
- Calculated in your browser
Results are based on your own estimates and give direction, not a benchmark. Your entries are calculated in your browser and aren't submitted to us.
Want a second opinion on your result?
For over a decade, Gemba Concepts has worked with manufacturers on the shop floor. Share what the tool showed you and we'll help you work out what to fix first.
More diagnostic tools
See all 10 toolsEnd-to-End Reliability Checklist
Follow one typical order past the last machine. Enter how long it waits at each step, then check seven controls. You'll see where OEE stops seeing your system.
Open the toolPlan Stability Assessment
Count last week's plan changes and check how they were handled. You'll get a Plan Stability Index out of 100 and the two fixes that would move it most.
Open the toolMaterial Readiness Checker
The ERP says you have it. Check one job's material against eight layers of readiness, see where it drops out, and keep a tally across jobs.
Open the tool