Skip to content

Overall Equipment Effectiveness

OEE Calculator

Enter one shift on one line. You get the OEE, the three losses that make it up and how many good units that line could make at world-class performance without buying anything.

Calculator

Tell us about one shift:

hrs / shift

Shift length minus planned breaks and meetings.

hrs / shift

Breakdowns, changeovers that overran, waiting for material.

units / hr

The machine's rated output when running at full speed.

units / shift

Everything that came off the line this shift, good and bad.

units / shift
₹

What one good unit is worth — sale price or standard cost, whichever this line is measured against.

days

World-class OEE is 85%. A typical discrete manufacturing line runs at 60%.

Your line is running at overall equipment effectiveness

72%

Availability:86%Competitive

Where the shift went:

Performance

86%

Quality

97%

Value left below 85% OEE

₹21,378

Annualized

₹64,13,400

Availability loss

14%

Performance loss

12%

Quality loss

2.5%

Want to know more?

Enter your work email if you would like a Gemba consultant to review these figures with you.

Trusted by Industry
500+

Industrial Businesses Across 3 Continents