Output per Person-Hour

Labour Productivity Calculator

Headcount is usually set by history, not by the work. Enter a line or a plant's monthly output, its total labour hours and cost, and the rate you believe it should run at — and see what the gap to that rate is costing you.

Calculator

Tell us about the workforce:

units

Good units, at the point where the line hands over.

hrs

Every person-hour paid for on this line or area, all shifts.

₹

Fully loaded — wages, PF, ESI, bonus and contractor margin — averaged across the workforce.

units / labour-hr

What you believe this operation should run at — a benchmark line, a sister plant or an engineered standard.

Structured manpower studies on Indian shop floors typically find 20–35% of direct labour time in non-value-adding movement, waiting and searching.

Your actual productivity is units per labour-hour

7.08

Cost of the productivity gap:₹3.36 LPer month.Significant

The figures behind it:

Annualized

₹40.3 L

Labour cost per unit

₹30

Gap to target rate

16.7%

Want to know more?

Enter your work email if you would like a Gemba consultant to review these figures with you.