Ceramic Tiles

Two-Thirds Faster Turnaround, Same Building

A ceramic tiles warehouse cut turnaround time by 68% and increased storage capacity by 43% by reducing handling and improving storage logic.

-68%

Turnaround-time reduction

Same building

Two-Thirds Faster Turnaround, Same Building

+43%

Storage capacity

Accuracy improved

Inventory

Materially reduced

Damage

The Situation

Floor-stacking operations increased touches for heavy, fragile SKUs, inflating both delay and breakage risk.

Locations were improvised, inventory confidence was low, and dispatch started as a search activity.

Speed and damage looked separate but originated from excess handling.

What We Did

We redesigned the warehouse for lower-touch movement and safer, denser storage.

  • Redesigned storage systems for density plus product protection.
  • Rebuilt inward-to-dispatch flow to eliminate handling steps.
  • Reworked WMS workflows to improve stock location certainty and count reliability.

The Results

Turnaround time reduced 68% and storage capacity increased 43% in the same building footprint.

Inventory became reliable, and product damage reduced due to fewer touches.

Key takeaways
  • 01

    Speed and breakage are usually a shared handling problem.

  • 02

    The fastest warehouse often wins by moving less, not moving faster.