The Situation

Frequent grade switches were consuming productive hours. Every changeover triggered resets, re-dialing, and restart scrap.

Planning sequenced reactively by incoming orders, so the lines changed over more often than the order mix required.

OEE remained low for a simple reason: too much of the day was spent not winding.

What We Did

We made changeover a primary improvement stream, not a side-effect of planning.

  • Applied SMED to separate internal and external setup work and shift preparation out of downtime.
  • Resequenced production to group similar grades and cut reset frequency.
  • Introduced structured preventive maintenance to protect planned run time.

The Results

Output rose 58% and OEE improved 25% by increasing true winding time, not by pushing machines harder.

Changeovers became fewer and faster, and maintenance ownership prevented availability drift.

Key takeaways
  • 01

    The fastest capacity is often the changeover you do not have to do.

  • 02

    Most new-line discussions start before current line time is fully recovered.