Less Raw-Material Space, More Boxes per Shift

A Fortune 1000 packaging operation cut raw-material storage from 50,000 to 38,000 sq ft while output increased from 12 to 25 boxes per shift.

50,000 → 38,000

Raw-material storage (sq ft)

Output increased in parallel

Less Raw-Material Space, More Boxes per Shift

50k → 38k sq ft

RM storage

12 → 25 boxes/shift

Production

U-shaped movement

Flow

Selective + cantilever

Racking

The Situation

Raw material and production competed for the same floor, with storage consuming disproportionate area.

Material flow doubled back, and planning treated space growth as the only path to capacity.

The five-year plan required better utilization before bigger footprint.

What We Did

We designed around movement first, then sized storage to support that flow.

  • Ran value-stream mapping and five-year capacity evaluation.
  • Designed a U-shaped flow to reduce travel and crossing.
  • Applied selective and cantilever racking based on load profile.

The Results

Raw-material storage reduced by 12,000 sq ft while output more than doubled to 25 boxes per shift.

The layout now supports planned growth without acquiring additional floors.

Key takeaways
  • 01

    Layouts designed for flow usually need less space and deliver more output.

  • 02

    Storage density and movement design must be solved together.