Transformation Outcomes
Case Studies
Real outcomes from the shop floor, with clear challenges, implementation details, and measurable business impact.
20
Published Case Studies
20
Industries Covered
80
Result Metrics Captured
All Stories
Browse Every Case Study
Showing 20 case studies

Solar PV Manufacturing
37% More Modules a Day, From the Same Plant
A Rs 2,500+ crore solar PV manufacturer lifted finished output from 1,404 to 1,923 modules per day in six months by recovering hidden losses at the stringer constraint.

Composite Pipe Manufacturing
58% More Output from the Same Winding Lines
A composite pipe manufacturer improved output by 58% and OEE by 25% by attacking changeover loss on helical filament winding lines.

Packaging and Label Printing
OEE More Than Doubled in Twelve Months
A national printing and packaging operation improved OEE by 123% in 12 months while reducing changeover time by 47% and wastage by 36.6%.

Advanced Materials
Flow Revealed Capacity the Batch Was Hiding
A sports-equipment manufacturer improved productivity by 269%, increased output 24%, and reduced throughput time 40% by moving from batch to flow.

Iron and Steel
Rs 15.24 Crore a Year, Found in Cost No One Was Watching
A Rs 1,500+ crore metals producer reduced conversion cost and consumable inventory burden, delivering about Rs 15.24 crore annual savings.

Food Processing
51 Roles Redeployed, Without Losing a Unit of Output
A bakery operation rebalanced four departments and safely redeployed 51 roles while fully holding output.

Textile
Rs 1.67 Crore a Year, from Staffing Decisions Made on Data
A knitted-fabric and garment operation reduced manpower cost by 11% over 15 months, delivering around Rs 1.67 crore annual savings.

Locks Manufacturing and Ecommerce
197% More Storage, in the Same Four Walls
A locks manufacturer unlocked 197% additional storage capacity by redesigning vertically and aligning WMS logic with new flow.

Industrial Packaging
Less Raw-Material Space, More Boxes per Shift
A Fortune 1000 packaging operation cut raw-material storage from 50,000 to 38,000 sq ft while output increased from 12 to 25 boxes per shift.

Ceramic Tiles
Two-Thirds Faster Turnaround, Same Building
A ceramic tiles warehouse cut turnaround time by 68% and increased storage capacity by 43% by reducing handling and improving storage logic.

Fashion Jewellery
Picking Productivity More Than Doubled
A jewellery distribution operation serving 68 stores and ecommerce improved picking from 5.6 to 12.2 items/min and cut touchpoints from 17 to 10.

D2C Fashion
Carton-to-Rack, from 6.4 Days to 1.2
A D2C fashion brand integrated inbound and fulfilment flow, reducing carton-to-rack from 6.4 days to 1.2 and overall order processing time by 81%.

Electrical Products Manufacturing
When Suppliers Miss, the Plant Pays for It
A leading electrical products manufacturer improved vendor OTIF from 48% to 64% and order fill rate from 93.7% to 96.1% through supplier visibility and planning cadence.

Artificial Leather
Rs 1.2 Crore a Year, Built Through Suppliers, Not Around Them
A large automotive and footwear supplier improved material availability and productivity through supplier development, delivering around Rs 1.2 crore annual savings.

Construction
Procurement Lead Time Cut 30%, Across Every Site
A construction organization moved from ad-hoc, site-by-site procurement to one visible workflow, reducing procurement lead time by 30%.

FMCG Manufacturing
27% Better OTIF, Measured Before It Was Fixed
An FMCG manufacturer improved OTIF by 27% after establishing structured OTIF measurement, ERP pipeline visibility, and root-cause corrective action loops.

Seasonal Retail
On-Time Fulfilment, from 82.3% to 96.5%
A seasonal demand network redesigned for peak behavior improved on-time fulfilment from 82.3% to 96.5% while reducing logistics cost.

Industrial Valve Manufacturing
A Facility Designed for 2.7X the Output
A valve manufacturer planned capacity from flow logic first, increasing planned output from 1,242 to 3,372 units/day before construction.

Packaging Manufacturing
A New Plant, Built Right the First Time and Commissioned on Schedule
A family-owned packaging exporter designed and commissioned a growth-ready greenfield facility on schedule, built exactly to drawing with no design change during construction.

Aluminium Rolling
40% Revenue Growth, from the Plant Already There
A large aluminium rolling operation improved flow, setup performance, and workforce deployment to unlock installed capacity and drive 40% revenue growth.