Back to Case Studies

Ceramic Tiles

Two-Thirds Faster Turnaround, Same Building

A ceramic tiles warehouse cut turnaround time by 68% and increased storage capacity by 43% by reducing handling and improving storage logic.

Turnaround-time reduction: -68%Same building

Results Snapshot

Turnaround time
-68%
Storage capacity
+43%
Inventory
Accuracy improved
Damage
Materially reduced

The Situation

Floor-stacking operations increased touches for heavy, fragile SKUs, inflating both delay and breakage risk.

Locations were improvised, inventory confidence was low, and dispatch started as a search activity.

Speed and damage looked separate but originated from excess handling.

What We Did

We redesigned the warehouse for lower-touch movement and safer, denser storage.

  • Redesigned storage systems for density plus product protection.
  • Rebuilt inward-to-dispatch flow to eliminate handling steps.
  • Reworked WMS workflows to improve stock location certainty and count reliability.

The Results

Turnaround time reduced 68% and storage capacity increased 43% in the same building footprint.

Inventory became reliable, and product damage reduced due to fewer touches.

Strategic Takeaway

  • Speed and breakage are usually a shared handling problem.
  • The fastest warehouse often wins by moving less, not moving faster.

Contact Gemba Concepts

Need Help Solving Similar Execution Gaps?

Connect with our consulting team to discuss your current operational challenge and the outcomes you want to achieve.

sales@gembaconcepts.com
India Offices | Serving India, Middle East, and Africa

Share This Article

Found this useful? Share it with your team and peers.

Email UsWhatsApp