Printing & Packaging Consulting
Printing and PackagingConsulting
Your presses are running. Your corrugators are running. So why is output still short of plan? Gemba Concepts finds where time, material and margin are quietly leaking — and fixes it alongside your team, until the results hold.
- Full-time on-site consultants
- Shop floor execution, not just advisory
- Measurable results within months
- Trusted by 500+ manufacturers
- Clients Served
- 500+
- Consulting Hours
- 1M+
- Industries
- 40+
- Years Experience
- 12+
Let’s Get Started






















.png&w=2560&q=75)


























































.jpg&w=2560&q=75)



















































What We Solve
Where Printing and Packaging Plants Quietly Lose Money
Most manufacturers lose 20-40% of their capacity to operational losses that have become part of everyday work. In printing and packaging, those losses hide inside short runs, frequent changeovers and material that sits in the wrong place for too long.
- 01
Changeovers That Eat the Shift
Every small change adds up to a lost shift.
We apply SMED so presses print, not wait.
Up to 52% shorter changeovers.
- 02
Printing Waste Nobody Owns
Makeready, rejects and reprints are lost margin.
We measure waste at source and fix the cause.
36.6% reduction in wastage.
- 03
Downtime You Cannot See
Hand-written logs miss micro-stops and waits.
We use TPM and live OEE to catch losses early.
OEE lifted from 28% to 63%.
- 04
Material You Cannot Find
Reels in the wrong bay. Board bought twice.
We redesign storage and set inventory norms.
98.5% inventory accuracy, 12,000 sq ft freed.
- 05
Delivery Dates Promised on Guesswork
Sales commits. Production finds out later.
We back every date with real machine capacity.
40% faster throughput time.
- 06
An ERP That Doesn't Talk to the Floor
Data lives in the ERP. Decisions live on WhatsApp.
We connect floor to system and guide ERP setup.
Production decisions run on real data.
Proven Results
Real Printing and Packaging Plants. Measurable Numbers.
These are implemented outcomes from packaging plants, not projection models.
- Printing & Packaging
40% improvement in throughput time
Changeover and wastage reductions backed by live OEE visibility.
- Throughput Time
- 40%
- Changeover Reduction
- 47%
- Wastage Reduction
- 36.6%
- Flexible Packaging
123% OEE improvement
OEE improved from 28.1% to 62.7% across printing and lamination lines, with cylinder changeovers cut from 95 to 45 minutes.
- OEE Gain
- 123%
- Changeover Reduction
- 52%
- Timeline
- 8 Mo
- Greenfield Corrugated Packaging Plant
Zero rework from day one of operations
Layout, standard work and operator training were designed before the first order ran, so the plant reached rated capacity without firefighting.
- Rework Hours
- 0
- To Rated Capacity
- 14 Wk
- Less Material Travel
- 22%
- Industrial Packaging
12,000 sq ft of storage space released
Reels and board were re-slotted by consumption, with inventory norms and cycle counting built into daily routines.
- Released
- 12,000 sq ft
- Inventory Accuracy
- 98.5%
- Faster Dispatch TAT
- 35%
Gemba Approach
Build improvements the operation can keep compounding.
We stay from diagnosis through implementation until the new way of working becomes the way the operation runs.
01
Diagnose
Find where performance is actually being lost, and confirm the real constraint.
02
Design
Build the better way of working around the constraint — process, roles, flow and controls.
03
Deploy
Run the change with the team, in real operating conditions, building capability as you go.
04
Durability
Stay until it holds, with the ownership and review rhythms that keep it that way.
Why Gemba Concepts
Most Packaging Consultants Hand You a Report. We Hand You a Floor That Runs Better.
- 01
On the floor, every day
Our consultants work full-time at your plant. They stand at the press during makeready, at the corrugator during a grade change, and at dispatch when the truck is waiting. Findings come from observation, not questionnaires.
- 02
Commercials built on your numbers
Scope is defined from your data, not a template. Every engagement starts with an ROI case, so the decision to proceed rests on numbers, not faith.
- 03
Process first, system second
Most ERP projects in the packaging industry fail for one reason: they digitize a broken process. We fix the flow on the floor first, then help you choose and configure the right ERP to hold the gain — whether that is your existing system or our own platform.
- 04
We exit when results hold
Review systems and audit structures are built into your team before we step back. We don't leave on a deadline.
Industries We Serve
Every Segment of Printing and Packaging
The problems differ by segment, and so does the approach. We have worked inside:
- Corrugated Boxes
- Flexible Packaging & Laminates
- Folding Cartons
- Labels
- Rigid Packaging
- Commercial Printing
Client Voices
What operators say after we leave.
“Practical, hands-on solutions that reduced wastage, optimized processes and increased overall equipment effectiveness.”
Jainam Deliwala
Director
Rolliflex Pvt Ltd
“Dedicated team efforts and data-backed, innovative solutions helped us deliver our operational targets.”
Mahaveer Agarwal
Managing Director
Suncity Metals & Tubes Pvt Ltd
“They built KPIs that give clear insight into our performance and enable data-driven strategic decisions.”
Aju Jacob
Joint Managing Director
Synthite Industries Pvt Ltd
Frequently asked questions
Ready to Find Out What Your Presses Are Really Capable Of?
Let's identify where throughput, wastage and material cost are hiding in your packaging operations.
No commitment. A focused 30-minute conversation.
Speak directly with a senior printing and packaging consultant.
Specific insights based on your plant, your machines and your product mix.
Response within 24 hours.
