Gemba Concepts

Better Productivity. Lower Costs.

Greenfield Plant & New Plant Setup

Build Your New Plant Right From Day One

A successful plant starts long before production begins. Our Greenfield Plant & New Plant Setup Consulting helps manufacturers design efficient layouts, establish robust operational systems, and accelerate production ramp-up for long-term manufacturing performance.

500+

Clients Served

12+

Years

40+

Sectors

1M+

Man Hours

Schedule A Meeting Today

By submitting, you agree to our Privacy Policy. Gemba Concepts may contact you via email or phone.

What We Solve

Why new plants struggle after launch?

A Strong Investment Doesn't Guarantee Strong Operations

Many Greenfield plants begin with modern infrastructure but struggle because layout, material flow, manpower planning, and operating systems are never fully aligned before production starts.

01

Layout Looks Good But Doesn't Flow

Poor material flow creates unnecessary movement from the first day.

How Gemba Helps

We design plant layouts around production flow, material movement, and operational efficiency.

Result: Smooth material flow with reduced handling losses.

02

Processes Are Not Standardized

Different teams follow different methods, creating inconsistency.

How Gemba Helps

We establish SOPs, workflows, visual controls, and operating standards before production begins.

Result: Faster operational stabilization and consistent execution.

03

Installed Capacity Isn't Fully Utilized

Production starts, but expected output never follows.

How Gemba Helps

We align capacity planning, manpower, layout, and production flow.

Result: Higher production output from Day One.

04

Production Ramp-Up Takes Too Long

Operations require months before reaching planned performance.

How Gemba Helps

We support implementation, commissioning, and production ramp-up on the shop floor.

Result: Faster go-live with stable operations.

How We Work

The Gemba Approach

Assessment & Diagnostics

A 2–4 day on-site assessment to understand plant objectives, layout requirements, material flow, production strategy, and implementation risks.

Scope, Deployment & Commercials

Implementation roadmap built around your project scope with clearly defined deliverables and ROI.

Current State Mapping & Baseline

Complete mapping of plant layout, production flow, utilities, manpower planning, storage, and internal logistics.

Proof of Concept, Implementation & On-Site Training

Solutions are validated before full deployment. Our consultants work alongside your team throughout implementation and startup.

Sustenance & Audit Handover

Management systems, KPIs, review routines, and operating controls are established before project handover.

Proven Results

Results we delivered

Greenfield Manufacturing Plant

35% Faster Production Ramp-Up

  • Structured layout and workflow implementation
  • Reduced startup inefficiencies
  • Improved operational readiness
  • Achieved within 4 months
Automotive Components Plant

30% Higher Output Stability From Day One

  • Aligned layout and production flow
  • Balanced manpower deployment
  • Reduced startup losses
  • Achieved within 6 months
FMCG Manufacturing Unit

40% Reduction In Material Movement Waste

  • Optimized plant layout
  • Improved internal logistics
  • Reduced unnecessary handling
  • Achieved within 5 months
Engineering Manufacturing

Faster Go-Live With Stable Operations

  • Standardized SOPs and production workflows
  • Operational KPIs implemented
  • Stable production achieved after launch
Testimonials

What Our Clients Say

Industrial Valves & Engineering Manufacturing

Setting up a new plant is the one opportunity you have to get everything right from day one. We engaged Gemba at the design stage and it made a fundamental difference. They validated every layout decision through KPI modelling - rack lengths, production areas, material flow paths - before a single machine was placed. Total production capacity went from 1,242 to 3,372 valves per day and space efficiency improved 43%. The facility was built to perform, not corrected after the fact.

Mr. Jayraj Shah

Director

EPP Composites Pvt Ltd

Mr. Jayraj Shah
1/6

Industries We Serve

Experience across diverse industries

We have supported manufacturers across:

Automotive
Auto Components
Pharmaceuticals
Life Sciences
FMCG
Consumer Goods
Engineering
Industrial Manufacturing
Chemicals
Process Industries
Printing
Packaging
Textile
Apparel
Solar
Renewable Energy

Trusted by

500+

Industrial Businesses Across 3 Continents

TCS
Godrej & Boyce
Ashok Leyland
Kajaria
Kenstar
Joyalukkas
Safari
Cello
Asian
TCS
Godrej & Boyce
Ashok Leyland
Kajaria
Kenstar
Joyalukkas
Safari
Cello
Asian
TCS
Godrej & Boyce
Ashok Leyland
Kajaria
Kenstar
Joyalukkas
Safari
Cello
Asian
TCS
Godrej & Boyce
Ashok Leyland
Kajaria
Kenstar
Joyalukkas
Safari
Cello
Asian
Rupa
Happilo
Veedol
Arvind
GIVA
Snitch
Bagmane
Pyramid
Shalco
Rupa
Happilo
Veedol
Arvind
GIVA
Snitch
Bagmane
Pyramid
Shalco
Rupa
Happilo
Veedol
Arvind
GIVA
Snitch
Bagmane
Pyramid
Shalco
Rupa
Happilo
Veedol
Arvind
GIVA
Snitch
Bagmane
Pyramid
Shalco

Ready to build a high-performing plant?

Every decision made during plant setup impacts future productivity, efficiency, and operational performance. Build your plant with the right layout, systems, and execution from the very beginning.

Schedule A Meeting Today

Schedule A Meeting Today

By submitting, you agree to our Privacy Policy. Gemba Concepts may contact you via email or phone.

Gemba Concepts

Copyright Gemba Concepts. All rights reserved.

Email UsWhatsApp