Skip to content
Cable & Wire Operations

Built Around How Cable ProductionActually Runs

Gemba maps your existing process first. We then connect production planning, finite capacity scheduling, shop-floor tracking and order-to-dispatch visibility in one practical system.

Cable extrusion line with drums of finished cable and rising output indicators
How It Works

Three things change on the floor.

01

Plan Better — schedule work using actual machine capacity.

02

Track Clearly — see every order and production stage in one place.

03

Respond Faster — manage priority changes before they delay delivery.

Free · Takes 5 Minutes

Score your line, station by station.

Twelve questions across drawing, bunching, insulation and dispatch. You get a composite plant signal, a per-station breakdown, and the specific places your answers say capacity is leaking.

  • 01

    Drawing

    Station 1 — Uptime & Availability

  • 02

    Bunching

    Station 2 — Changeover & Speed

  • 03

    Insulation

    Station 3 — Data & Planning Visibility

  • 04

    Dispatch

    Station 4 — Quality & Stock Control

Free Download

Cable Production Planning & Tracking Control Kit

A practical control kit to review:

  • Production scheduling
  • Work-in-progress tracking
  • Order and dispatch visibility

Find What Is Slowing Your Cable Production

Review one live production order with Gemba. See where plan changes, capacity gaps or missing updates are affecting delivery.

Three Gemba consultants with a laptop showing the Gemba Concepts mark