Automotive Manufacturing Consulting
More Output From the Automotive Plant You Already Run.
We help automobile manufacturers and auto component makers across India get more good parts from every shift, with steadier quality and a lower cost per part. Most of that gain is already inside your plant. We help your team find it and keep it.
- On your shop floor, not in a meeting room
- Former Toyota professionals on the team
- Every result measured against a signed baseline
- Clients Served
- 500+
- Years
- 12+
- Industries
- 40+
- Shop Floor Execution
- 100%
Let’s Get Started






















.png&w=2560&q=75)


























































.jpg&w=2560&q=75)



















































Where the Gain Sits
Where Automotive Plants Find Their Next Gain.
Six Areas on Your Shop Floor Where There Is Usually More to Give
We look at all six and start where the payoff is biggest.
- 01
Every Station Working to the Same Pace
One slow station sets the speed for the whole line, and the stations after it wait.
We time every station, share the work out evenly and keep the slowest machine running through breaks and changeovers.
More parts per shift from the same line.
- 02
More Good Parts From the Machines You Own
Small stops, slow running and waiting for repairs quietly use up planned hours.
We track OEE on your key machines, find the biggest losses and fix them one by one. A 10-minute daily care routine helps operators keep machines healthy.
OEE tells you how much good output a machine gives in the time it was planned to run.
Higher OEE and fewer surprise breakdowns.
- 03
Quicker Model and Die Changes
Every setter changes over in their own way, so the time taken is different every time.
We film one changeover and move the prep to before the machine stops. Tools and dies wait ready on a trolley. The best method becomes the standard.
More running time every shift, smaller batches and room for more variants.
- 04
Right the First Time, Every Shift
Most checks happen at the end of the line, so a problem is found after many parts are made.
We move checks to the station where the part is made, add simple mistake-proofing and give each top defect an owner and a date.
Less rework and rejection, and stronger ratings from your customers.
- 05
Parts at the Line, Right on Time
Operators leave the line to fetch material, while extra stock sits in the wrong places.
We give every part a fixed spot and quantity at the line. We refill it based on what the line uses and set stock levels to match real demand.
Steady lines, less searching and cash freed from extra inventory.
- 06
The Same Good Result, Whoever Is on Shift
New operators learn by watching others, so output changes from shift to shift.
We put picture-based instructions at every station and a skill chart on every line. Leaders take a short daily walk to check the standard holds.
The same output across operators, shifts and plants.
Free tool · EV and automotive plants
How ready is your EV plant for start of production?
Go through the 25 activities between layout and SOP. Mark where each one stands and who owns it. You will see your readiness by stage, the activities that still need an owner, and a draft responsibility map to share with your team.
- About 6 minutes
- No login, nothing to prepare
- 25 activities, 6 stages
- From layout to start of production
- Built for EV and automotive
- Battery, motor, MCU and vehicle assembly
In this tool, SOP means start of production. Standard operating procedures are called standard work.
Get free access to the readiness check
Share your details to open the tool. Your results go to our team, and a consultant can walk you through them.
- 1Layout
- 2Process
- 3Quality
- 4Equipment
- 5Validation
- 6SOP
Proven Results
Results we delivered
From plants working on the same things automotive lines work on every day: OEE, changeovers, output and supplier delivery.
- Packaging and Label Printing
OEE More Than Doubled
- OEE up 123%
- Changeovers 47% shorter, wastage down 36.6%
- Achieved within 12 months
- Solar PV Manufacturing
37% More Modules a Day, From the Same Plant
- 1,404 to 1,923 modules a day
- Stringer OEE from 38.4% to 53.7%
- Achieved within 6 months
- Composite Pipe Manufacturing
58% More Output From the Same Winding Lines
- Quicker changeovers and a smarter production order
- Planned maintenance to protect run time
- OEE up 25%
- Electrical Products Manufacturing
Suppliers Delivering On Time, In Full: 48% to 64%
- Supplier scorecards and shared demand plans
- Regular supplier performance reviews
- Order fill rate from 93.7% to 96.1%
Gemba Approach
Build improvements the operation can keep compounding.
We stay from diagnosis through implementation until the new way of working becomes the way the operation runs.
01
Diagnose
Find where performance is actually being lost, and confirm the real constraint.
02
Design
Build the better way of working around the constraint — process, roles, flow and controls.
03
Deploy
Run the change with the team, in real operating conditions, building capability as you go.
04
Durability
Stay until it holds, with the ownership and review rhythms that keep it that way.
Who We Work With
Built for India's Automobile and Auto Component Makers
From full vehicle assembly to the smallest precision part.
- Passenger vehicles
- Commercial vehicles
- Two-wheelers
- Three-wheelers
- Tractors
- Electric vehicles
- Contract vehicle manufacturing
- Engine and transmission parts
- Gears and bearings
- Brakes, steering and suspension
- Forging and casting
- Machining and precision parts
- Sheet metal, body and chassis
- Plastics and rubber parts
- Electricals, electronics and wiring harness
- Fasteners
- EV components
- Dies and moulds
Expansion & EV
Growing? Let's Build It Right the First Time.
For plants adding capacity, opening a new site or moving into EV parts.
- 01
New plant or new line
We design the layout around how parts should move, before construction starts. We designed one new industrial valve plant for 2.7X the output.
- 02
Moving into EV
New products bring new processes, new suppliers and new skills. We help you set up lines, standards and training that work from day one.
- 03
Steadier suppliers
Supplier scorecards, shared demand plans and regular reviews, so parts reach your line on time and in full.
- 04
Simple digital tracking
Live OEE boards, maintenance tracking and warehouse systems, added once the process is right, so the gains stay visible.
Client Voices
What manufacturing leaders say after we leave.
“Exceptional expertise in reducing bottlenecks, optimizing stock movement and data-driven inventory management.”
Sanjeev Wangoo
Executive Director – Supply Chain
Veedol Corporation Limited
“Practical, hands-on solutions that reduced wastage, optimized processes and increased overall equipment effectiveness.”
Jainam Deliwala
Director
Rolliflex Pvt Ltd
“Dedicated team efforts and data-backed, innovative solutions helped us deliver our operational targets.”
Mahaveer Agarwal
Managing Director
Suncity Metals & Tubes Pvt Ltd
Frequently asked questions
Ready To Get More From Your Automotive Plant?
Your lines can give more than they do today. Let's find out how much, together.
